
Catalent has acquired Promethera Biosciences’ cell therapy manufacturing subsidiary, which includes a 32,400 ft2 facility in Gosselies, Belgium.

Catalent has acquired Promethera Biosciences’ cell therapy manufacturing subsidiary, which includes a 32,400 ft2 facility in Gosselies, Belgium.

Moderna will double the space at its Moderna Technology Center in Norwood, MA, to transform it from a production and lab space into an industrial technology center.

Moderna has entered into an agreement with Gavi, the Vaccine Alliance to supply up to 500 million doses of its COVID-19 vaccine to the 92 Gavi COVAX Advance Market Commitment low- and middle-income countries.

AMRI will increase R&D and manufacturing capabilities for orphan and rare disease products.

Under the terms of the contract, Meissner will expand its Camarillo, Calif., manufacturing site by adding additional cleanroom manufacturing space, executing advanced inventory management systems, and adding support areas to supplement capacity.

Complex formulations, personalized medicines, COVID-19 therapies, and sustainability goals are driving innovations in drug packaging.

Aprecia and Glatt investigate manufacturing technologies to widen the formulation design space for oral delivery.

Breakthroughs in analytics and alternatives to traditional freeze drying promise to reshape biological development and the cold chain.

Despite the COVID-19 pandemic, the industry has made great strides in implementing serialization technologies, while technology developers are enabling more open access to real-time transportation data.

Aber Instruments launched its new Futura neotf single-use biomass sensor for process fingerprinting for on-line monitoring and control of cell culture.

The European Medicines Agency and the European Centre for Disease Prevention have joined forces in a new initiative aimed at strengthening the post-marketing surveillance of COVID-19 vaccines in Europe.

ViroCell will supply viral vectors and gene modified cells, to academic and corporate clients, for translational cell and gene therapies going into clinical trials.

Moderna’s investments will double the formulation fill/finish and drug substance manufacturing of its vaccine to up to three billion doses in 2022 at various manufacturing sites.

ADMA will now have the ability to produce Bivigam at an expanded capacity with the same manufacturing scale, while using the same equipment, release testing assays, disposables, and labor force.

Avantor plans to increase its single-use manufacturing footprint by 30% and double its cleanroom space in the US and Europe.

AkesoBio’s expanded manufacturing capacity, enabled by the addition of another Cytiva FlexFactory platform, will be used to meet current and future market needs in China as well as worldwide.

In addition to the traditional FOYA category awards, ISPE recognized two facilities for operational agility during the COVID-19 pandemic.

With a $5 million grant from DARPA, DNA Script and Moderna will develop a prototype for rapid mobile manufacturing of vaccines and therapeutics as part of the DARPA’s Nucleic Acids On-Demand World-Wide program.

Sanofi will perform the fill/finish of up to 200 million doses of Moderna’s COVID-19 vaccine at its Ridgefield, NJ, facility starting in September 2021.

Samsung and TG Therapeutics have expanded their 2018 contract manufacturing deal for the supply of TG’s ublituximab, an investigational anti-CD20 monoclonal antibody.

Lonza’s new complex will occupy 2000 m2 of the facility with six levels of manufacturing space and will provide room for future small-molecule technologies expansion.

DCAT’s annual bio/pharmaceutical development and manufacturing business event, DCAT Week, will take place virtually from July 12–16, 2021, with the in-person even postponed to March 20–24, 2022 in New York City.

The decision comes from the US CDC Advisory Committee on Immunization Practices following the evaluation of data showing a rare adverse event involving blood clots in combination with low platelet counts within approximately one to two weeks following vaccination.

Executives that participated in the CPhI post-pandemic survey are predicting a push for repatriation of manufacturing globally.

Lipid production at Evonik’s Hanau, Germany, site was set up in eight weeks and met high-quality requirements, accelerating delivery time, which was originally set for mid-2021.