Manuela Gottschall is Head of Risk and Project Management, Global Quality at Roche.
Industry 1VQ Solutions: Change in Size of Thermal Shipping Solution Used for Transport of Product
September 1st 2022A Post Approval Change (PAC) in size of thermal shipping solution used for transport of product is considered a low risk provided it has been qualified and temperature monitored, and therefore can be downgraded from a prior approval to a notification to health authorities, and managed in the PQS with immediate implementation effect.
Industry 1VQ Solutions: Addition of a Testing Lab to an Existing Testing Site
August 24th 2022Addition of a testing lab to an existing testing site as a Post Approval Change (PAC) is considered low risk when there is no change to testing procedure, specifications, equipment, and the additional lab is already approved by health authorities for other testing activities. Such PACs should be managed in the Pharmaceutical Quality System (PQS) only rather than requiring prior approval.